| Figure 6-1 Bankers Trust building with impact damage. | 6-1 |
| Figure 6-2 Closeup of area of partial collapse. | 6-2 |
| Figure 6-3 Floor plan above the 2nd level (ground floor extension not shown). | 6-3 |
| Figure 6-4 Area of initial impact of debris at the 23rd floor. ..... | 6-4 |
| Figure 6-5 Approximate zones of damage. | 6-5 |
| Figure 6-6 Moment-connected beams to columns. | 6-7 |
| Figure 6-7 Column with the remains of two moment connections. | 6-7 |
| Figure 6-8 Failed shear connection of beam web to column web. | 6-8 |
| Figure 6-9 Suspended column D-8 at the 15th floor. | 6-8 |
| Figure 6-10 Area of collapsed floor slab. | 6-9 |
| Figure 6-11 Bankers Trust lobby (note debris has been swept into piles). | 6-9 |
| Figure 6-12 Office at north side of the 8th floor. | 6-10 |
| Figure 6-13 3-D ANSYS model of flange and shear plate moment connection. | 6-14 |
| Figure 6-14 3-D ANSYS model of flange and seat moment connection. | 6-14 |